radiant force Index du Forum radiant force
Forum d'entraide et de blabla sur Fire Emblem.
 
 FAQFAQ   RechercherRechercher   MembresMembres   GroupesGroupes   S’enregistrerS’enregistrer 
 ProfilProfil   Se connecter pour vérifier ses messages privésSe connecter pour vérifier ses messages privés   ConnexionConnexion 

Cheap Los Angeles Chargers Jerseys

 
Poster un nouveau sujet   Répondre au sujet    radiant force Index du Forum -> Astuces -> Fire Emblem 13 : awakening
Sujet précédent :: Sujet suivant  
Auteur Message
bears123


Hors ligne

Inscrit le: 19 Avr 2018
Messages: 161

MessagePosté le: Jeu 12 Juil - 08:20 (2018)    Sujet du message: Cheap Los Angeles Chargers Jerseys Répondre en citant

by Martin Williams

JOHANNESBURG Melvin Ingram Jersey , Jan. 12 (Xinhua) -- With South African industries and schools reopening this week after a festive season break, the country braces for renewed power outages.

Energy experts said due to constraint generation capacity of the monopoly power utility Eskom and delay in construction of new power stations, power shortage will persist in South Africa in the foreseeable future.

Eskom spokesperson Andrew Etzinger said recently the country's "power system remains vulnerable" and urged South Africans to "pull together over the next few months and use electricity sparingly at all times."

South African energy expert Chris Yelland said in an interview with Xinhua that the week would be "testing" and any further generation failures could be disastrous.

Analysts said South Africa's electricity supply problems, which are inhibiting economic growth and disrupting daily lives, can be traced to a government decision in the 1990s not to build more power stations. Eskom has also been dogged by a maintenance backlog, skills shortages and financial difficulties.

In addition, an ambitious Joey Bosa Jersey , multi-billion dollars building program, which belatedly began in 2007, is behind schedule and over-budget, prompting analysts such as Yelland to predict an unstable power supply for up to four years.

Eskom's financial problems are compounded by the need to run expensive, diesel-powered turbines as emergency back-up for faltering coal-fired power stations. Etzinger told a Johannesburg radio station in December that diesel was costing 2 billion South African rands (173 million U.S. dollars) a month, equal to Eskom's annual budget for diesel. In addition, Eskom is compelled to sell electricity at prices below its operational and capital costs.

Yet South African consumers have been resistant to a spate of tariff increases Melvin Gordon Jersey , which have all been well above the inflation rate of 6 percent.

Yelland told Xinhua that this meant Eskom's financial outlook was harmed by declining sales and increasing costs.

Inadequate maintenance of existing plants has led to breakdowns, resulting in power outages which have seen electricity-dependent industries curtail their operations or delay expansion plans. Sectors most affected include South Africa's mining industry, which suffered heavy losses in 2008, during the country's most severe blackout.

Since November 2014, South Africans have been subjected to regular warnings about "load shedding," whereby power supplies to certain areas are switched off for a set number of hours, in accordance with schedules published on websites. However Cheap Los Angeles Chargers Hats , there are regular complaints that the published schedules, which vary according to the severity of the threat to the national grid, do not coincide with actual power cuts.

Thus the planning of business and domestic routines is disrupted. Traffic, which in most South African cities is controlled by electric-powered signals, is also affected.

Hopes for relief from the crisis are pinned on the construction of two huge coal-fired power stations, which are both behind schedule. Other plans include international deals for nuclear power stations, the introduction of significant independent power producers Cheap Los Angeles Chargers T-Shirts , and greater use of renewable energy sources such as solar power and wind turbines.

However, for the foreseeable future, South Africa will continue to rely primarily on coal for its electricity supply, according to Yelland.

While 80 percent of South Africa's electricity is derived from coal, the country also has two nuclear reactors at Koeberg near Cape Town, generating about 5 percent of the nation's supply. In several speeches during 2014, the South African government indicated it intended to make greater use of nuclear reactors.

Preliminary cooperation agreements have been signed with entities in China Cheap Los Angeles Chargers Hoodie , Russia, the U.S., France and South Korea, regarding the provision of nuclear power. A similar agreement with Japan is pending, according to the World Nuclear Association. Yelland described this initial phase as a "beauty parade," a prelude to any serious negotiations.

The South Africa government has declined to indicate who the favored contractors might be, or how a nuclear building program would be financed.

Eskom is in poor financial health and could not afford to build nuclear power stations Customized Los Angeles Chargers Jersey , Yelland told Xinhua.

South African Public Enterprises Minister Lynne Brown told the country's Mail & Guardian newspaper on Friday there was "pressure on the company's liquidity position."

"Eskom will run out of money by the end of January," she said.

South African economist Dennis Dykes, said on Sunday that the economic effect of South Africa's electricity problems will be worse in 2015 than in previous years. In 2014, Eskom's woes slashed South Africa's growth rate down to 1.4 percent.

"This year it's a different situation. It's negatively affecting the retail sector, it's much more across the board and it's much more immediate," Dykes said.

Earlier economists had predicted the South African economy could grow by 2.5 percent in 2015. However, Dykes said the Eskom crisis "certainly has the potential of hurting growth Cheap Los Angeles Chargers Jerseys , anything between half a percent to one percent of GDP."

The Medupi power station, which is under construction at Lephalale, in the country's Limpopo Province, will consist of six boilers, each powering an 800 megawatt (MW) turbine, thus producing 4800 MW, about 12 percent South Africa's power. Synchronization of the first unit (unit six) at Medupi was at one point supposed to occur in December 2013. However Corey Liuget Chargers Jersey , several delays over contractual problems, labor issues and quality standards have seen that date pushed to mid-2015.

Another large power station, Kusile, which is being built in Nkangala District of South Africa's Mpumalanga province, will also consist of six 800MW units. While it is
Profiting from the Hom.


Revenir en haut
Publicité






MessagePosté le: Jeu 12 Juil - 08:20 (2018)    Sujet du message: Publicité

PublicitéSupprimer les publicités ?
Revenir en haut
Montrer les messages depuis:   
Poster un nouveau sujet   Répondre au sujet    radiant force Index du Forum -> Astuces -> Fire Emblem 13 : awakening Toutes les heures sont au format GMT + 1 Heure
Page 1 sur 1

 
Sauter vers:  

Index | Panneau d’administration | forum gratuit | Forum gratuit d’entraide | Annuaire des forums gratuits | Signaler une violation | Conditions générales d'utilisation
World of Warcraft phpBB template "WoWMoonclaw01" created by MOONCLAW/MAËVAH(EU-Sinstralis/EU-Illidan) (v1.05) - http://www.wowcr.net/templates
© World of Warcraft and Blizzard Entertainment are trademarks or registered trademarks of Blizzard Entertainment, Inc. in the U.S. and/or other countries. wowcr.net is in no way associated Blizzard Entertainment.
Powered by phpBB © 2001, 2005 phpBB Group
Traduction par : phpBB-fr.com